Juba–Nimule Corridor: Motor Graders Deployed for 42 km Regravel

South SudanJuba

Kaid General Trading supplied three CAT 140K motor graders, two 20-ton pneumatic rollers for a national roads contractor in Juba, South Sudan.

Kaid General Trading was engaged by a national roads contractor to deliver three CAT 140K motor graders, two 20-ton pneumatic rollers for works in Juba, South Sudan. The scope required equipment on site within a tight mobilisation window, with all export and customs documents cleared ahead of arrival.

Our procurement team sourced the units against the client's technical specification, staged them at the nearest KGT hub, and shipped a consolidated at our Mombasa yard and trucked up the Northern Corridor. Every unit shipped with an operator manual, inspection report and a KGT-DSIG proforma invoice verifiable directly from our website.

On site, the three CAT 140K motor graders was commissioned by our field engineers alongside the contractor's crew. Handover included spare-parts stocking recommendations and a service schedule tailored to the road construction duty cycle.

The delivery is one of dozens Kaid General Trading has completed across Eastern Africa and the Gulf. If you have a similar requirement, request a quote through the site — most proformas are issued within 24 hours.